Sep 9 2010 - 2010-01-01 12:00:00 - Your City

If you are involved in Management or Customer Service and are responsible for communicating the value of smart meters to your utility customers, you don’t want to miss this online discussion - Communicating Smart Meter Value.  more...

Social Media: The new frontier in recruiting, communications and marketing

Sep 13 2010 - 2010-01-01 12:00:00 - Your City

Join social media mavens Matthew Burks and Amanda Shewmake as they provide an insider's perspective on how HR, communications and marketing professionals in energy companies can harness the power of social media to be more effective and productive. more...

Eliminating Obstacles and Delivering the Benefits of the Smart Grid - IBM's Optimized Energy Value Chain (OEVC)

Sep 14 2010 - 2010-01-01 12:00:00 - Your City

The convergence of power and information technologies in the smart grid has created opportunities for finer grained and broader controls of energy flows. These opportunities can improve electric service in multiple dimensions: lower cost, greater reliability, greater customer satisfaction, and more...

Achieving Operational Excellence - What to Consider Before Implementing or Upgrading Your Distribution Management Solutions

Sep 16 2010 - 2010-01-01 12:00:00 - Your City

Significant cost over runs. Changing business requirements. A well thought out plan is essential. Attend this free webcast discussion to hear inside hear three experts in utility operations discuss what utilities need to evaluate when they are considering upgrading or more...

Outsmarting the Smart Grid: IT, Security and Communication Infrastructure  Challenges & Opportunities for Utilities

Sep 21 2010 - 2010-01-01 12:00:00 - Your City

The smart grid is shifting the playing field for utilities. And when the game changes, it pays to be prepared. A nimble solutions partner can help you design the solutions that keep operations on track, even as new challenges come more...

1st CSP Today Concentrated Solar Thermal Power Summit India

Sep 7 2010 - Sep 8 2010 - New Delhi India

Deliver a profitable, productive and commercially successful large scale CSP business in India. Building on the success of past events in USA, Europe & MENA, CSP Today brings to New Delhi the most relevant international experience for the concentrated solar more...

Offshore Wind Energy in North America's Great Lakes Conference

Sep 9 2010 - Sep 10 2010 - Toronto

Two day conference that tackles the most important challenges. A blend of European knowledge from the companies who have been installing offshore wind turbines for the last decade alongside local state governing bodies and leading project developers. Permitting, securing long more...

Autovation 2010

Sep 12 2010 - Sep 15 2010 - Austin, TX - USA

Autovation 2010 is a not-to-miss educational forum that will attract utility executives from around the world looking for new ways to optimize their operations through automation technologies. more...

Global Sustainable Bioenergy North American Convention

Sep 14 2010 - Sep 16 2010 - Minneapolis, MN - USA

The North American convention provides a remarkable opportunity to play a part in guiding renewable energy policy for the 21st century. Attendees will create a resolution that, along with similar resolutions already drafted on four other continents, will help set more...

GridWise Global Forum

Sep 21 2010 - Sep 23 2010 - Washington, DC - USA

Hosted by the GridWise(R) Alliance and the U.S. Department of Energy, the GridWise Global Forum will convene thought leaders from the highest levels of government, business, NGOS, and academia from around the world to discuss the ultimate enabling potential of more...

1. Intro to Nat Gas Trading & Hedging 2. Option Applications in Energy

Sep 20 2010 - Sep 23 2010 - Houston, TX - USA

Introduction to Natural Gas Trading & Hedging - This program provides a comprehensive understanding of the structures that underlie Natural Gas trading. Beyond Essentials: Option Applications in Energy - This course provides a solid practical and conceptual (non-quantitative) understanding of more...

Electric Business Understanding Seminar

Sep 20 2010 - Sep 21 2010 - Houston, TX - USA

Electric Business Understanding provides a comprehensive overview of the electric industry. Position yourself for career advancement by gaining a solid understanding of how the electric business works including key physical, market, and regulatory aspects and how market participants navigate this more...

Electric Market Dynamics Seminar

Sep 22 2010 - Sep 23 2010 - Houston, TX - USA

Electric Market Dynamics offers participants an in-depth understanding of North American electric markets and how they function. Enhance your career by furthering your knowledge of market structures, pricing mechanisms, services offered in markets, and how various participants use the markets more...

Gas and Electric Business Understanding Seminar

Oct 5 2010 - Oct 6 2010 - Los Angeles, CA - USA

Gas and Electric Business Understanding provides a comprehensive overview of the natural gas and electric industries. Position yourself for career success by gaining a solid understanding of how each business works, including key physical, market and regulatory aspects, as well more...

Energy Central
Power Network




Communications & Security


We know you have something to say!
There is an immediate need for articles on the hot topics in the Power Industry! EnergyPulse, like no other publication, also provides a means for our readers to immediately interact with experts like you.
 
Contribute Today!
Please view our Author Guidelines and send submissions to the editor.

Click For More Articles on Communications & Security
 
ThreatSim: Securing Wattage When It’s Needed
10.14.02   Roger Anderson, Director, Energy Research, Columbia University
Albert Boulanger, Senior Staff Associate, LDEO, Columbia Univ.

Article Viewed 7888 Times
4 Comments
E-mail Article Printer Friendly
 
  • Email This Author
  • Comment On Article
  • About The Author
  • More Articles By This Author

  • Email This Author
  • Comment On Article
  • About The Author
  • More Articles By This Author
    The terrorist events of 9/11, when combined with the power shortages we are all experiencing across the country this summer, suggest that we as a country are not well prepared to meet what is sure to be a growing threat to our ability to deliver electricity where its needed, when it is needed, in the future. Our Power Infrastructure, in particular, delivers the electricity that our entire economy depends upon. Take out the grid for more than about 12 hours (the operational maximum of most back-up power generation systems) and you shut down the internet, stop all bank transfers, credit card and cash machine transactions, pumps and compressors needed to transport drinking water, fill your car or truck up with gasoline and diesel, deliver natural gas through pipelines and storage facilities no longer work, and stop lights and other key components of the transportation system like railroad and subway power and signaling fail. Most manufacturing comes to a standstill (c.f. NY Times, July 21, 2002 and Figure 1). About the only thing that will continue to work is the landline phone system: the microwave network supporting cell phones will also be shut down. Figure 1. Thermal image of power consumption in New York City, which this summer is actually increasing, in spite of 9/11. New York City saw an immediate 140 megawatt (MW) drop in electricity demand and a total net reduction of 90 MW with the destruction of the World Trade Center, but that was only about 20 percent of what was predicted in some early reports (Power Alert II: New York's Persisting Energy Crisis, New York Independent System Operator, March, 2002). Is it realistic to think that a coordinated attack on the national power grid could succeed in shutting down electricity across the country for a substantial time? We believe the threat is real, and that training in response and prevention should be a highest priority of the new Homeland Defense Department. What does it take to build an accurate Electric Grid Threat Simulator? First and foremost, the topologies of the regional high voltage grids managed by Regional Transmission Operators (RTO’s) and Independent System Operators (ISO’s) must be combined on the computer with local power grids, and more generally, distribution networks managed by utilities such as ConEd in New York City, Keyspan on Long Island, PSE&G in New Jersey, and hundreds of other public and private generation and distribution companies across the country (Figure 2). Figure 2. Northeastern high voltage electric grid on left is connected to local low voltage grids through vulnerable switching and transformer sub-stations (triangles at right). An Electricity Threat Simulator
    The burden of developing efficient electric grid threat simulators for war gaming must be shared by city, state and federal governments, the national labs, academia and electrical research institutions, but also by the power distribution, generation, and service companies themselves. It is they who will use the simulators to train their operators. Below we review the current state of affairs in Power Control Systems(PCS’s) in this country and discuss the need for anti-terrorist training and simulation software that will allow us to determine the true threats and appropriate responses to sustained, coordinated attacks on the electric grid. Of particular concern are the PCS’s that control the production and distribution of electricity throughout the country. Below, we show that they will have to be very much more sophisticated and integrated than at present. It will take a whole new generation of technologies to unite the topologies of the electricity grid on its many scales. Luckily, much of this systems integration technology has been developed recently by the aerospace, automotive and manufacturing industries. The task at hand is its adoption by an electricity industry that is historically late adaptor of new technologies. That, in turn, will require experts and expertise imported into a corporate and governmental regulatory culture bred out of the electrical utilities of our grandparents: one that is notorious for being insular and slow to respond to technological change (not late, but the very last technological adapters). 9/11 has emphasized the need to fix the Electric Grid Threat Simulation and modeling system before the next attack. With this need in mind, let’s review the present state-of-preparedness of Power Control Systems, and compare them to more modern, integrated command-and-control systems in the military and from other industries. We argue that there is little doubt that fixes must come quickly or our very economic stability may be at risk. Figure 3. Seamless communications among Power Control Systems of the RTO, ISO and local utilities will be required to redistribute electricity in case of future terrorist attacks against the grid. Pictured here is the Connecticut Valley Electric Exchange. It’s computers do not communicate easily with those from the regional network managers. Today’s Power Control System
    Developing an adequate Electric Grid Threat Simulator to train operators of the multiple organizations required to respond to coordinated attacks is not a matter of simply joining the various computer systems that currently run the grids (c.f. Figure 3). As the Pentagon found in trying to integrate computer systems from the different armed forces, predictability declines as the integration tasks become more and more complex. Breakdowns occur that have not been foreseen from historical experiences with the smaller, more linear systems that in the past acted independently. We participated in a detailed analyses of current and planned technical improvements in the transmission and generation Power Control System of a major regional electricity supplier considered to be a technological leader in the electricity industry. The grid under its management supplies a major urban area of the United States (not New York City) that includes more than 5000 square miles and several million people. This PCS is operated and supported 24 hours a day, 7 days a week, by approximately 100 conscientious and well trained people. Its mission is to balance power loads among private consumers, businesses, and industrial users against the various generation resources available to it, both from internally owned generators and from external purchases available through company’s trading floor. The PCS in basic concept is really very simplistic. Since consumption is not known second-to-second (meters are not analyzed for consumption patterns, but are instead used only by the billing department), the computer merely balances the spin of power generator turbines under its control to keep the AC of the grid at as close to 60 Hz as possible. Any less and the computer revs up the RPM’s of turbine generators; any more and the computer sells the excess power to the regional grid through itsbrokerage. Problems appear if the frequency of the AC in the transmission grid begins to drop below 59.99997 Hz (five nines) for computers, and below 59.997 (three nines) for electric motors, and then “all hell breaks lose” to quote an operator from the PCS. The inflow and outflow of electricity is monitored in real-time at all Interconnect sites and at critical junctions of the company’s own transmission lines. The data are transmitted to the PCS every 2 seconds. Simultaneously, real-time costs are computed for all generators used to produce power for the company. A diverse mix of natural gas, coal, oil, steam and nuclear energy fuels these generators. Costs to produce power for all generators and fuel combinations are constantly compared with prices available from suppliers. The PCS automatically selects the cheapest alternative at any time for adding power to the grid. In addition, the PCS manages a one-way, real-time Supervisory Control and Data Acquisition (SCADA) network that sends an additional 230,000 measurement inputs to the PCS every 30 seconds. For emergencies such as hurricanes and tornadoes, the PCS has computerized controls that extend directly into circuit breakers for computer banks and expensive electrical equipment of major business customers. The problem is that both the software and hardware of the PCS were designed (and often built) decades ago under the assumption that excess power would always be readily available from other utilities on the regional grids. If the computer didn’t have enough generators to meet demand, it would purchase electricity from the regional grid at a fixed price. With de-regulation of the electricity industry, thousands of independent electricity producers are popping up all over the country to sell expensive power at times of high demand. In addition, choke points are popping up at critical and varying junctions of the electricity grid all over the nation. Human-in-the-Loop
    Most operator tasks are not automated within the PCS, but depend upon the experience and awareness of the people themselves. The operational processes of the staff are procedure-based and well-documented, but are available only in paper manuals. The company does not use new software capabilities available for automating alarms, work-tag tracking, and the opening and closing of circuit breakers remotely. No trend analyses or problem resolution is done computationally, nor is a data historian used (common practices in other industries). The “technology cycle” for new computer software and hardware (still paired) has historically been 14-16 years, with the latest upgrade the most rapid in company’s history (1988 to 2000). We found the PCS operators “bracing for a long next few years” and the software vendor lamenting the “incredibly long sales cycle in the power industry.” Perhaps more critical in today’s world, while there is an excellent and well practiced plan for restoration of services from natural disaster outages (common), there is still nothing about terrorism (not yet anticipated when the procedures were last updated in 2000). Training has become a special issue: the operational staff is “too busy”, and has erratically attended organization, and training sessions. The SCADA data that is used for training must be real-time, and cannot be replayed for instructional purposes. No case histories are used. There was no training simulator in this software update cycle, a casualty of budget cuts. It is ironic that the cost to maintain an up-to-date simulator became too high because of the rapidly changing configuration and complexity of the national power grid, and particularly of the rapidly expanding power input into the company’s grid from independent power producers and customer co-generation facilities as the result of de-regulation. The major drivers to operational costs of the company are Operations and Maintenance (O&M) of its facilities. Overhauls of generators and reconfigurations and modernizations of its power grid must be scheduled well in advance and coordinated with other regional suppliers in order to be transparent to customers. Software updates must be handled with particular care. The company upgraded the PCS computer systems in 2001 to a client-server, UNIX architecture, supported by an Oracle database, and modern graphical User Interfaces (GUI). However, the networkability of the system still leaves something to be desired. Its Ethernet is just now being upgraded to 100Mbps, and top management for security reasons forbids use of the Internet for communications with the field and its own SCADA systems. The company Intranet is primitive at best, and no Microsoft products are found in the PCS at all (perhaps the last remaining industry for Bill Gates to conquer). Operators are NOT utilizing many of the new features of the PCS software system. For example, the 2001 software design supports interoperability between the two types of UNIX workstations: one to control interaction between the company and outside power suppliers, and one for control of internal company power distribution. In spite of this feature, operators of one system cannot call up or interact with the other. Operators are trained to operate both systems, and they do rotate from one to the other on a regular schedule, but they are not allowed to let the computers communicate. Work orders to substations and power linesmen are created on a computer, printed out, and then FAXED to the field offices by the PCS operators. These work orders are not tracked further by the PCS, although it has the capability to manage electronic work orders and automatically send e-mails. Use of a Threat Simulator in the PCS?
    Optimization within the PCS is a manual process executed by experienced personnel without much computer help. In our Case Study, expert systems and Artificial Intelligence (AI) technologies for the complex scheduling required for power management “were looked at years ago by IBM. They tried to develop a prototype system. However, IBM declared their process to be too complex, and moved on to easier markets.” This analysis was done in 1985, and the power company still considers it valid. IBM’s opinion is that they tried to develop a prototype of too much of the operations at once, back then. New neural network and data mining technologies should make this a “very doable task in today’s computational world” according to IBM. It is ironic that the added complexity of the system made the keeping of an accurate computer simulator expendable. That would be like an aerospace company saying that its new planes are too complex to create a training environment for pilots -- other than flying the machine itself. A Coordinated Terrorist Attack on the Power Grid
    A new generation of American engineers and managers must be trained in electricity production and distribution under threat from terrorism. An Electric Grid Threat Simulator for the PCS is required that will train in the complexities introduced by terrorism, combined with the coincident convergence of supply and demand across the electricity grid of North America. Such threats, if geographically distributed, coordinated, and sustained over a period of time, will drive the electricity grid to more and more non-linearity, causing breakdowns that have not been foreseen from previous experiences with the more linear systems of today. A future workforce must be trained to cope with this uncertain future. Automated variance detection, combined with “make-it-so” problems-to-solutions mappings, is a non-linear inverse problem that requires a simulator to teach operators how to solve. The integration of technologies required for this cross-system optimization problem will require an unprecedented degree of interdisciplinary collaboration among the various operators of the topology of the grid, from local to regional and national and international, in and of itself. In a grid model with hundreds of thousands of failure points, training becomes problematic without proper computer simulators. The Electric Grid Threat Simulator must not be too general. It must focus on critical failures that have specific remedies. The chaining of these events is where the simulator becomes powerful. Each element of a transfer function that covers both the regional, national, and local grid topologies can then be transformed into responses. Closure can then be computed. Global behavior is then determined from the synthesis of the component models. Put directly, what are the threats, and what are the failure points. These must be determined through what we call a “Learning Harness” wrapped over the topological models of the various scales of the grid. Consider a coordinated attack on the local components of the power grid. In order, they attack the microwave communications of SCADA data, then a power generator and a transformer substation, all within several minutes of each other. The cascading failures result in escalating problems throughout the local grid that don’t at first affect the national high voltage grid (c.f., Peerenboom, 2001). Suppose now, however, that this attack is followed a few minutes later by a coordinated attack on the high voltage regional transmission grid. The first hit causes problems in Maine (Figure 4). Then a minute later, Buffalo is hit, where most spare generators are. Within 3 minutes, problems have spread throughout the northeastern United States if remedial action to deliver missing power and reroute electricity is not activated on a massive scale – and within about 5 minutes. The question is: what system do we use to train for such scenarios? Figure 4. Simulated terrorist attack on the Northeastern Power Grid. Note how quickly the problem spreads from Maine to Buffalo, then to the entire Northeast. (Yellow and Red are areas with inadequate power to keep the lights on, obviously bad for all electrical machinery and computers. Simulations from PowerWorld.com). Design of a Electric Grid Threat Simulator
    In general, few PCS simulation environments exist to train new engineers and managers about how to respond to crisis scenarios of any kind. The case study revealed that fault detection and tracking of what has failed, where, and when, remains dependent upon operator experience and “instinct”. We hope that the incentive for change got a significant boost on 9/11. No question the PCS can be better supported by computer intelligence in the form of a Electric Grid Threat Simulator for War Gaming. As we said, we believe a Learning Harness is required in order to build such an Electric Grid Threat Simulation environment. The Learning Harness represents first a fundamental mapping of the business, security, environmental, and engineering processes and activities required to maintain and operate the grid under attack, and then a reinforcement learning feedback loop to optimize decisions across systems (Figure 5). This explicitly requires a concerted, confidential, unprecedented collaboration of all involved parties. These processes must be known in enough detail to develop computerized variance detection and contribute weights to the “credit assignment” problem of what to do to anticipate and fix the problems caused by terrorists. Known solutions to problems are kept in a best practices data historian. The system must learn from mistakes by tracking performance metrics of previous actions in much the manner of a chess, backgammon or checkers program. A key technology we use is the Suitability Matrix(sm). This is a linked set of matrix representations (a set of spread sheets) that use generalized weights as the values of the cells. It maps import of an attribute (a problem) to possible decisions (a solution). These matrices are "populated" using reinforcement learning, a type of dynamic programming, which optimizes decision-making under uncertainty and time (4D learning). Data gathering for such a system will provide the following:
    • Eliminate the "wish I could have seen it coming" through multiple scenario planning
    • Estimate risk on all decisions
    • Identify solutions quickly
    • Eliminate latency in getting the right actions to the right people
    • Verify that actions are being executed properly in the field
    Figure 5. The Electric Grid Threat Simulator must connect software applications that constantly re-compute each bullet indicated above – this framework has already been enacted for the Oil, Internet, and Aerospace industries (Bertsekas and Tsitsiklis, 1995). The key foundation to our Threat Simulator is an adaptive feedback control system, which involves the solving of implicit and explicit inverse algorithms in a controller to minimize error and arrive at an optimal solution (Bertsekas and Tsitsiklis, 1996.). We adopt a mixture of AI, operations research, and systems engineering to build our controller. AI works well with discrete, richly structured, and nonlinear problems and control theory offers an overall framework for solving the linear and nonlinear components of the system-wide problem (Werbos, 1999, 2001). Certainty factors or probabilities to represent ranking of alternatives can be adapted by the Electric Grid Threat Simulator learning system over time (e.g. Neuneier, 1995, Werbos, 1998, 1999). This online learning is key to a successful Electric Grid Threat Simulator. In sum, our Threat Simulator implements a unified framework for generating corrective actions that individuals and automated systems in the organization must take to align the business to reality in the face of multiple threats. The Learning harness uses metrics to gauge feedback and train for best responses. It uses a discrete forward model to compute event propagation. This is the same problem encountered by the Internet, and there are management programs that do just that to reroute message traffic in case of a failure in a router or a series of routers, automatically. The use of Codebooks within Internet fault detection software (Yemini et al, 1996, 1997, 2001) is a good example (see www.smarts.com). Causal analysis determines how each problem propagates through the topology, then “cost-to-go” simulation within a reinforcement-learning framework is used to determine automatic corrective actions Update the learning harness several times with varying simulated disasters, and it learns the correct responses. Priorities in response are then developed by the system depending upon a damage metric (Anderson et al, 1996, 1998a,b,c, 1999, 2000, 2001a,b, 2002). Summary
    The electrical grid of North America is under significant threat, and as a fundamental underpinning of the global sustainability of our economic system, we must take remedial action to save it. Grand Challenge change is required, not incremental tuning. As a first step, a Electric Grid Threat Simulator is needed immediately to train a new generation of energy professional in ways to cope with the radical new world they face in the electricity workplace under threat. Gone are the days when Americans took vital services like electricity, computer networks, and safe drinking water for granted. We must be diligent against this new terrorist threat or our infrastructure will come tumbling down, and along with it, our American way of life. Bibliography:
    Anderson, R.N., Boulanger, A., Bagdonas, E., He, W., and Xu, L., Method for Identifying Subsurface Fluid Migration and Drainage Pathways in and Among Oil and Gas Reservoirs Using 3-D and 4-D Seismic Imaging, U.S. Patent 5,586,082, 1996.
    Anderson, R.N., et al, Quantitative Tools link Portfolio Management with use of Technology, Oil Gas Journal, Nov. 30, p. 48, 1998a.
    Anderson, R.N., A. Boulanger, 4-D Command-and-Control, Am. Oil Gas Rep., 1998b.
    Anderson, R.N., Oil Production in the 21st Century, Sci. Am., 278, p. 86-91, 1998c.
    Anderson, R.N., Esser, W., How to Operate an Advanced Digital Enterprise, Offshore Technology, Oct., 2000
    Anderson, R.N., Esser, W., Energy Company as Advanced Digital Enterprise, American Oil & Gas Reporter, Jan. 2001a.
    Anderson, R.N., Boulanger, A., He, W., Xu, L., Method and System for Automated Support of Real-Time 4D Business Decisions for the Upstream Petroleum Industry, U.S. Patent, applied for, 2001b.
    Anderson, R.N., Boulanger, A., Mello, U., He, W., Wiggins, W., and Xu, L., 4-D Seismic Reservoir Simulation and Characterization Method and System, U.S. Patent, applied for, 2002.
    Bertsekas, D.P., Tsitsiklis, J. N., Neuro-Dynamic Programming, Athena Scientific, 1996.
    Neuneier, R., Optimal Strategies with density-Estimating Neural Networks, ICANN 95, Paris, 1995.
    Peerenboom, J., Infrastructure interdependencies: Overview of concepts and terminology, Argonne National Laboratory, 2001.
    Werbos, P.J., Elastic Fuzzy Logic System, U.S. Patent 5,751,915, 1998. Werbos, P.J., Maximizing Long-Term Gas Industry Profits in two Minutes using Neural Network Methods, IEEE trans. On Systems, Man, and Cybernetics, Vol. 19, No. 2, 315-333, 1989. , U.S. Patent 5,924,085, 1999.
    Werbos, P.J., 3-Brain Architecture for an Intelligent decision and Control System, U.S. Patent 6,169,981, 2001.
    Yemini, S., Kliger, S., Mozes, E., Yemini, Y., and Ohsie, D., High Speed and Robust Event Correlation. IEEE Communications, May, 1996.
    Yemini, Y., Yemini, S., Kliger, S., Apparatus and Method for Anaylzing and Correlating Events in a System using a Casualty Matrix, U. S. Patent 5,661,668, 1997.
    Yemini, Y., Yemini, S., Kliger, S., Apparatus and Method for Event Correlation and Problem Reporting, U. S. Patent 6,249,755, 2001.

    For information on purchasing reprints of this article, contact Tim Tobeck ttobeck@energycentral.com.
    Copyright 2010 CyberTech, Inc.
     
    Contact The Author
    Email the author
    E-mail Article Printer Friendly
     
  • Click Here For More Articles on Communications & Security


  • Click Here For More Articles By Roger Anderson
  • Do you agree or disagree with this article? Send in your own article.

     

    Readers Comments

    Date Comment
    Greg Borichevsky
    10.17.02
    Very timely and thought provoking article.

    Perhaps the authors would be able to comment on the capabilities of existing Operator Training Simulators and their effectiveness where deployed.

    Another conclusion that can be drawn from the author's observation of the slow deplyment and adaptation of technology by the industry. It would follow that the utility industry also needs to significantly advance the deployment of new systems, improved processes, and operational procedures.

    The deployment of a the proposed simulation tool combined with operational training may be an important step for the industry to withstand a terrorist threat.

    However, it is also CRITICAL that the industry take a good hard look at the operational readiness its systems, processes, and procedures to enable it to meet its commercial objectives and its wider community role as provider and front line protector of the critical infrastructure that is under its direct control.

    Kenneth Huckeba
    11.5.02
    I see the need for the concern. I'm of the opion that we have ignored the big picture in other areas that have a more immediate and direct effect on our power grids.

    Twenty years ago, here in California, we were a rate based utility. The generation facilities and the transmission grid were top notch. Budgets for maintenance and repair were built into the rate base. Profit was not the primary consideration, quality and capability were. Yes, it was a system with too many people. Yes it had excessive warehouse supplies. The utilities could have used a little trimming here and there.

    The pay off for this was a system that was second to none. Despite the expansive territory, adverse weather systems, an incredible summer to winter load difference and many other problems the system was always handled in a spectacularly efficient manner with astounding on line times and low outage records.

    You can ask any service company in California. Business is not done in the same way. Outages and maintenance are done in a very different manner with great emphasis put on cost. Manning in much thinner. Waiting times for breakdown maintenance are greater. Maintenance intervals are stretched further. Control and communications for the grid has been broken up much in the manner of the people of Babel!

    Our system as a whole is no where near it's fine status as twenty years ago. This great experiment has yielded higher costs to the consumer while providing a degraded service. What a shame. Our utilities are a national resource paid for by taxes, fees, and rates by our forefathers and should never have been exploited for profit!

    The concern over a terrorist threat to the grid can be alleviated by proper law enforcement catching, prosecuting, and ridding our country of these vermin. I feel that we have a much larger elephant in the living room and it's most certainly being ignored.

    Mike -
    11.5.02
    I read this article with great interest. However, I do not agree with the statements concerning system frequency excursions (section on Today's Power Control System, "five nines and three nines frequency"). Operation at 59.99997 Hz does not pose problems for computers and operation at 59.997 does not pose problems for motors. The system in the west commonly operates for short times down to 59.6 HZ without any loss of computer or motor load for large generation loss (up to 2500 MW). Also this article is devoid of discussion of Automatic generation Control (AGC) which controls the net electrical exchange from a control area (when frequency is low and the generators increase generation, excess power is not sold to the regional grid through brokerages!) After reading this article, I hope the people designing a threat security software are more knowledgable than the authors.

    Anthony Sleva
    11.11.02
    While the subject article is well intended, my 30+ years of experience designing substations and protective relaying schemes, operating power systems, and training people to design and operate high voltage electrical systems leads me to a significantly different conclusion.

    First, a small group of terrorists can shut down the electrical grid without launching a coordinated attack on the power grid. In reality, there are a few critcial points, not the hundreds of thousands of points mentioned in the article.

    Second, the power grid can operate between 57 hertz and 60 hertz indefinitely. The weak link, as far as frequency is concerned, is mechanical vibration of large steam turbine generators, not transformers, or motors or generators.

    Third, if frequency starts to creep up, generators need to be throttled back, selling power to other regions only helps if generators in other regions run back.

    Bottom line: Before Electricity Threat Simulators are developed, power system design and operation during power system transients needs to be well understood by the simulation developer. Computer simulations (Power System Stability Studies) have been utilized for a long, long time to predict power system response. Electricity Threat Simulators should use power system stabilty studies as their primary input resource.

    Add your comments:
    Please log in to leave a comment!

    Top

        Home | Register | Subscribe | Contribute | Advertise | About Us | Feedback
       Copyright © 2002-2010, CyberTech, Inc. - All rights reserved. Read our Terms of Service.